English
News 15 Sep, 2014

Port State Control - Riyadh MOU - Concentrated Inspection Campaign 2014

The six maritime authorities of the Riyadh MOU on Port State Control (PSC) have announced that they will be running a Concentrated Inspection Campaign (CIC) from 1 October 2014 until 31 December 2014 addressing compliance with SOLAS Chapter II-2 and the International Code for Fire Safety Systems (FSS Code).

Port State Control Officers (PSCOs) conducting routine PSC inspections during the currency of the CIC will use an additional checklist of 14 items covering the following areas:

  • Fire Control Plan
  • Fire detection and alarm systems
  • Fire fighting appliances and equipment
  • Fire suppression systems
  • Emergency fire pump and fire main isolation valves
  • Escape route lighting
  • The Planned Maintenance System (PMS) in place in respect of these areas

In addition to the physical inspection and testing of the foregoing areas, the crew may be required to demonstrate their familiarity with the fire fighting systems and appliances and be called upon to conduct a fire drill for the benefit of the PSCO.

If deficiencies are found, the action taken will depend on the severity of the findings. Serious deficiencies may result in the vessel being detained, particularly if the PSCO answers “No” to one or more of the three questions on the additional checklist marked with an asterisk.

Members requiring further guidance are advised to contact the Loss Prevention department.